Through value engineering and our expert in-house design team, we were able to offer a cost saving solution by using their own manufacturers to build the climber to the same design.
The installation teams worked extended early hours to avoid public disruption. TCL were able to deliver the fencing, surfacing, play area installation, mature tree planting and landscaping of the boulevard using their in-house, directly employed teams; avoiding outsourcing and subcontracting works whilst remaining within budget. The area benefited from an exciting central feature to the residential and public open space plots, bringing life to the Castleward development.